Installing Carpet Without Padding: 2 Easy Parts To Install Carpet Without Using Padding Method


2 Easy Parts To Install The Carpet Without Using Padding Method

The users can easily install the carpet without using padding method by following the below mentioned parts with steps but make sure to first collect the items needed to perform this task:

Items Required

  • Broom & Nylon Scrub Brush
  • Utility Vacuum & Bucket
  • No-Residue Cleaner & Large Framing Square
  • Sponge & Chalk
  • Fans & Measuring Tape
  • Chalk Line & A utility knife

Part I- Cleaning The Surface

  • Step 1: The users need to clean up all the dust and the debris particles from the floor by using the broom or the vacuum.
  • Step 2: Then make a mixture of the chemical with the water in a small-sized bucket and then stir the mixture well so that the cleaner is perfectly mixed with the water.
  • Step 3: Then you need to dip the nylon brush in this mixture and then rub the damp nylon brush over the entire surface of the floor.
  • Step 4: Then the users need to clean up all the cleaner residue from the floor by using the clean sponge followed by rinsing the floor with the clean water respectively.
  • Step 5: After rinsing the floor with the clean water the users need to allow the floor to get dried off completely by turning the fans of the room on so as to speed up the evaporation process.

Part II-Install the Carpet

  • Step 1: Start by measuring the floor corner from one side of the wall and then divide that calculated measurements in the half so as to locate the central area on the wall side. Then the users need to mark that central area on the surface of the floor by using the chalk or the pencil as well. The users need to repeat this on either of the parallel walls.
  • Step 2: Then the users need to place the L-designed framing square over the floor surface with one of the legs of the framing square flush with the surface of the wall. Then they need to adjust the 90 degrees angle edge point of the framing square with the marked point at the central area. One of the framing square legs should remain bumped over against the wall and another framing square leg should widen straight over the floor surface from the marked area.
  • Step 3: Then they need to trace out that framing square leg that is extended straight over the wall with the pencil so as to create the straight line of the pencil over the floor surface. Then they need to craft another line of the pencil over the floor that should come straight out of the centered marked area.
  • Step 4: Then the users need to pull up the chalk line over the floor from the pencil lines over the other wall. Then they need to line up the pencil lines as well as the chalk lines together and they need to drag the chalk lines tight and then grab all the lines with the floor. Then they need to repeat the same procedure while making the other line over the floor surface with another line of the pencil by making the big cross designed that will intersect with the central area of the room.
  • Step 5: Then the users need to transfer the heap of the carpet tiles at the central area of the room at the point where the lines meet.
  • Step 6: Then they need to peel off the backing from the carpet and then line up the carpet tiles with corners of the chalk lines accordingly. Then the users need to peel off the adhesive paper from the back of the other carpet tile and place it in the other spot within the surface of the first tile.
  • Step 7: The users need to continue the same procedure while pressing the other carpet tiles over the surface of the floor. In order to fit up the last carpet tile with the wall, they need to trim the carpet tile by using the utility knife so as to make it perfectly adjusted with the wall.
Connect with GetRit GetRit.com Furniture Facebook GetRit.com Furniture Twitter
Copyrights (©) 2024 GetRit.Com   All Rights Reserved